images
Photos
CLEYS
Project details
Location
Bornem
Architect
n/a
Start of works
April 2025
Execution period
3 weeks
Project type
Facade insulation with crépi finish
Grain & color
Standard grain 1.5 mm - OW-1-a
Extras
Plinth in granulate texture
New zinc rainwater pipe
Grille in the facade replaced
Surface area in m²
40
project
Terraced house
CLEYS
The challenge
In Bornem, this terraced house underwent a thorough facade renovation with attention to detail and sustainability. The exterior walls were fitted with 14 cm of insulation and finished with crépi, giving the home a fresh and sleek look. At the bottom, a plinth in granulate texture was chosen, durable and low-maintenance. The zinc rainwater pipe was renewed, and the grille in the facade was replaced as well. A neat and efficient upgrade that’s ready for the future.