Facade insulation with crepi finish
The facade is completely renovated in terms of energy efficiency through facade insulation.
images
Photos
CLEYS
Project details
Project
Semi-detached house
Location
Melle
Architect
n/a
Start of works
March 2025
Execution period
3 weeks
Project type
Facade insulation with crepi finish
Grain & Color
Standard grain 1.5 mm - LFC 0231
Extras
Window sills in zinc
Roof edge in aluminium
Plinth in granulate grain
Surface in m²
90
CLEYS
The challenge
In Melle, this house received a stylish facade upgrade. The facade was insulated with 10 cm and the dormer with 16 cm, both finished in a soft cream-colored crepi. The plinth in granulate grain, zinc window sills, and aluminium roof edge provide a durable and refined finish. A beautiful combination of insulation, aesthetics, and attention to detail.