Project details
Start of works
August 2023
Execution period
1.5 weeks
Type of project
Facade insulation + crepi
Grain & color
1.5 mm - standard white
Extras
Plinth in granular texture + waiting conduit in the facade
Surface in m²
120
Client
Mr. Verbeeck
Location
Lebbeke
Architect
n/a
CLEYS
The challenge
At the back of the house, the window and the door were not installed at exactly the same height due to a measurement error (the door was higher than the sliding window). The owner asked us to discreetly correct this with the exterior plaster, which we successfully did.